Note: I wrote this on my earlier blog hosted as http://parallelspirals.blogspot.com. I recovered the text from the WayBack Machine. This post appeared on December 13, 2010 as per the time stamp. I’m trying to collect here again all my old writings spread on various blogs.
On December 20, 2010, India will replace the ageing INSAT-2E communications satellite. The satellite has served India since 1999 by providing telecommunication, television broadcasting and meteorological services.
The launch of GSAT-5P which is to take place from Sriharikota will use the Russian cryogenic engine for the third stage of the GSLV. Hence, this is designated as the GSLV Mk-I. The vehicle is already on the launch pad and was moved there and anchored on Sunday. Last week, the satellite, GSAT-5P was placed inside the heat shield.
The significant events before launch between 4 and 4:30 pm 5:30 pm on December 20, include a full systems check today, followed by a launch rehersal without the liquid and cryogenic fuel on December 17.
There has only been one successful PSLV and one failed GSLV that has taken place this year in Sriharikota this year. I am guessing scientists will be anxious to get this launch right. This is another reason why the spotlight is falling back on this launch. The GSLV has been a programme with mixed results with 3 successes and 3 failures.
Once ISRO updates its website with more information I will carry more detailed article on the subject here.
[This post is based on this news report.]